PRODUCTS

DX54D+Z Galvanized Steel Wire

Galvanized wire is processed from high-quality low-carbon steel wire rod, which is formed by drawing, acid washing, rust removal, high-temperature annealing, and hot-dip galvanizing. It is processed through cooling and other technological processes. Galvanized wire is divided into hot-dip galvanized wire and cold dip galvanized wire (electroplated zinc wire).

PRODUCT PARAMETERS

NameGalvanized iron   wire
Size rangeBWG8   - BWG 26
Zinc coat30-280g/m2
Tensile   strength350-550N/mm2
Elongation10%
Surface   treatmentPVC   coated.electro or   hot dipped galvanized
Packing

1.LCL:packed     with plastic film then on the pallets           2.FCL:Nude packing

    3.Other special package according   to customers' requirements.
Delivery TimeNormally 7-15 days after   receipt of deposit.
Brand Nameoriental   flourish
Model Numbergalvanized   iron wire
Surface   Treatmentgalvanized
TypeRound   wire
Processing   ServiceWelding.     Bending.Cutting
Product nameGalvaized   Iron Wire
MaterialLow   Carbon Steel   Q195.sea 1008
ApplicationBuilding   Material
SurfaceGalvanised   Zinc
ColorSliver
Coil weight1kg-1000kgs/coil
Wire GaugeBWG8-BWG26
PackageCustomers   Request
    KeywordGllavanized   Iron Wire   Bwg21
Wire diameterBWG26-BWG8(0.45mm-4mm) or as required

PRODUCT DISPLAY

PRODUCT APPLICATION

PRODUCT PACKAGING

FACTORY DISPLAY

FAQ

Q1. What is your terms of Packing?

A: Generally we pack your goods with Neutral English bag, PP Woven bag with PE inner bag. If you have your own legally registered sack design, we can pack your goods with your brand and design bags after getting your authorization letter.

Q2. What is your terms of payment?

A: Normally 30% TT as deposit in advance, and 70% TT after email the copy of BL. Or LC at sight. We'll show you the photos pf your goods and package before you arrange the payment.

Q3. What is your terms of delivery?

A: Normally we do FOB, CFR, CIF terms.

Q4. How about your delivery date?

A: Normally it will takes 10~15 days after receive the deposit. The specific delivery time depends on the items and the quantity of the order.

Q5. Can you produce according to the sample?

A: Normally it will takes 10~15 days after receive the deposit. The specific delivery time depends on the items and the quantity of the order.

CONTACT US

Name必填Name格式错误
Mobile必填Mobile格式错误
Company必填Company格式错误
Address必填Address格式错误
Email必填Email格式错误
Message必填

PRODUCT RECOMMENDATION

Copyright © Zhongdashun (Shandong) Steel Co., Ltd